Home » Sequent Control of Geometry » Valid Planning Foundation
 

A good framework is half of the planning - no, it is far more, because the success of the planning, the approval and realization as well as the efficiency of a project, depend on it. Unfortunately you are not able to see if the framework is “good” or insufficient.

Whether there are maps, files, measurements, statements or analyses, all the following use of them stand on shaky feet if there are gaps, errors, discrepancies, discontinuities or even worse, if there happen willful deflections or if over the time of their use they are no longer identifiable. Therefore you should develop a framework, which meets the following requirements and criteria:

Full information Consistancy Stochastics
Quality by system Traceability Simultaneousness
Transparency Information transfer Acceptance control
  • Full information gives the cheapest solution.
  • Consistency: a three-dimensional solid scaffold is the basis of all arrangements. During the project it can be modified in a controlled way. Spatial and temporal discrepancies or discontinuities will not happen.
  • Stochastic: delivers an error budget for existing structures. It is controlled by the daily measurements. Succeeding users can work with it.
  • Quality per system: well defined workflows and controls create a high quality level of all service products.
  • Traceability: Every element in all results must be retraceable to its original measurement and to its author.
  • Simultaneousness: The use of our platform geohaus-online.de creates an up to now unattained rate of controlled simultaneousness for all authorized persons.
  • Transparency: The deployment of the Systems GEObox and modern sensors creates transparency in the workforce and machine deployment as well as for the fleet-management - in space and time.
  • Immediate control and consolidated acceptance reports: The error-free transfer of information between contractor and follower is crucial for the quality of the building. If these controls during the are system-related, the error rate will be reduced drastically and the quality of the building will be improved vice-versa.

These controls have to be transparent for the responsible persons. Even the official controls should be incorporated in the system, so that they get out of the incoherence of disjointed visual inspections. Then the official file storage will not deviate from the reality.