The transfer of the planned geometry into the construction site depends mainly from the point-identification, which means from the accuracy, which can be gained by defining an object point on a given structure.

Construction – tachymeters - well adjusted - deliver a distance accuracy of ± 3 [mm]. The point identification on a given structure is inherently much lower.